Service 03 · Wet Rooms

Wet Rooms in Reading

A wet room is a waterproofing job first and a tiling job second. Get the tanking wrong and the ceiling below will tell you within a year.

Fixed written quote5-year guaranteeFully insured
Wet Rooms project completed in Reading, Berkshire

Every wet room we build starts with a full tanking system: primer, taped joints, corners and pipe collars, then two coats of waterproof membrane and a flood test before tiling begins. The former sits in a recess cut into the joists with the falls built in, so water reaches the linear drain instead of pooling at the door.

The result is a space that feels bigger than the room it replaced. We can tuck the floor tile straight into the drain channel for a continuous surface, keep the wall and floor in the same stone-effect porcelain, and add a recessed niche at the height you actually shower at rather than the height that suits the joists.

What is included

  • Tanking system with taped corners and pipe collars
  • Pre-formed shower former with falls to a linear or point drain
  • Flood test before any tile is laid
  • Level-access entry with no tray to step over
  • Recessed niches and bench seats built to your dimensions
  • Electrics and extractor coordinated with your fitter

Materials we work with

Stone-effect porcelain

Slip-rated R11 surface for the floor

Microcement effect

Seamless look with tile practicality

Mosaic shower floor

Extra grip and easy falls

Linear drains

Wall-to-wall or tile-insert channels

Wet Rooms questions

No. A properly formed wet room is level access. Where joists will not allow a recess we use a low-profile former, which adds roughly 25mm to the finished floor height.

Next step

Tell us the room. We will tell you the number.

Send a couple of photographs and rough dimensions and you will have a fixed, written price within one working day. No visits needed for a ballpark.